Insight into the work

Insight into the work

The construction phase has come to an end. Here is an insight into the work of the wing team: The main task of the wing team was drilling the drag wire holes. As a model, preparations were made, such as preliminary drawings and adjustments to the drilling jig. Next, the holes were pre-drilled to ensure […]